Loading H and H

WaterproofingApplicators

Protecting your building from water ingress.

Freshly coated roof terrace with a seamless grey waterproofing membrane

Overview

Waterproofing concerns the complete treated area, including where surfaces meet. Roof edges, joints, outlets and pipe penetrations need as much attention as the main surface when planning an application.

We assess the area and prepare the substrate before applying the selected system. The approach depends on the existing construction, exposure and intended finish, whether the work concerns a roof, terrace or wet area.

Assess
Conditions and existing finishes
Prepare
Surfaces, joints and edges
Apply
The agreed protection system

What’s included

The system, preparation, access requirements and any testing are defined after assessment. Existing damage, concealed conditions and removal of finishes can affect the extent of the work.

  • 01

    Site Assessment

    Review the location, visible signs of water entry, previous repairs and the surfaces accessible for inspection.

  • 02

    Surface Preparation

    Identify the cleaning, repairs or removal of existing material needed before the selected system can be applied.

  • 03

    Waterproofing Application

    Apply the agreed system in line with its product requirements and the conditions of the project.

  • 04

    Roof & Terrace Waterproofing

    Consider exposed areas, drainage points, upstands and the relationship between waterproofing and the final surface finish.

  • 05

    Wet Area Waterproofing

    Address agreed bathroom or other wet-area surfaces, including connections around outlets and service penetrations.

  • 06

    Joint & Detail Treatment

    Resolve edges, changes of plane and penetrations as part of the application rather than as separate finishing items.

  • 07

    Application Checks

    Review completed areas and confirm specified checks before the waterproofing is covered or subsequent work begins.

How we work

  1. Freshly coated roof terrace with a seamless grey waterproofing membrane01

    Understand the issue

    We review photographs, the affected area and the history of leaks or repairs. Assessment helps establish accessible conditions and what needs further investigation.

  2. Liquid waterproofing coat being rolled onto a roof slab02

    Define the approach

    The proposed system and preparation are matched to the surface and use. Access, removal of finishes and coordination with other trades are clarified.

  3. Applicators sealing a retaining wall with a bituminous waterproofing layer03

    Prepare & apply

    Surface preparation and detail treatment precede the main application. Work follows the selected system's requirements, including curing and protection stages.

  4. Reinforced slab ready for concrete ahead of waterproofing04

    Check & protect

    The application is reviewed, with testing where specified and suitable. Protection and maintenance requirements are discussed before subsequent finishes or use.

Questions

Can a system be selected from photographs alone?

Photographs help with an initial discussion but do not show every substrate or concealed condition. The proposed system and scope depend on assessment of the area and intended use.

Do existing tiles or finishes need to be removed?

This depends on their condition, the issue and the selected system. The proposal should identify removal and reinstatement work, including who will carry it out.

What determines the extent of a repair?

The visible affected area is a starting point for assessment. Existing finishes, previous repairs and adjacent details may need review before deciding whether a local treatment or wider application is appropriate.

What should I send with my enquiry?

Include the location, approximate area, photographs, when the leak occurs and any previous repairs. Mention access restrictions and whether there are occupied rooms below.

Next service05

SiteSupervision